ACN Newswire
Highlights:The 2025 Winter Program concluded with 6,997 metres (m) drilled across 14 holes.Drill hole CS25-028 encountered eight (8) spodumene pegmatite intervals, with the widest interval of 50.9 m of continuous spodumene pegmatite, along with additional noteworthy intercepts of 21.5 m and 19.3 m.Drill hole CS25-036 encountered 13 spodumene pegmatite intervals…
Read More
Q2 Metals Extends Mineralized Zone Strike Length to 1.5 Kilometres and Concludes the 2025 Winter Program at the Cisco Lithium Project in Quebec, Canada
Highlights:The 2025 Winter Program concluded with 6,997 metres (m) drilled across 14 holes.Drill hole CS25-028 encountered eight (8) spodumene pegmatite intervals, with the widest interval of 50.9 m of continuous spodumene pegmatite, along with additional noteworthy intercepts of 21.5 m and 19.3 m.Drill hole CS25-036 encountered 13 spodumene pegmatite intervals…