ACN Newswire
Highlights:An additional two (2) drill holes for approximately 1,188.1 metres (m) were completed during the Summer 2024 Drill Campaign and reported herein.Drill hole CS24-022 encountered 14 spodumene-pegmatite intervals, with the widest continuous interval of 52.3 m.Drill hole CS24-023 encountered 15 spodumene-pegmatite intervals, with the widest continuous interval of 188.6 m.Vancouver…
Read More
Q2 Metals Drills 188.6 M Interval of Continuous Spodumene-Pegmatite and Concludes the 2024 Summer Drill Campaign at its Cisco Lithium Property, James Bay Quebec Canada
Highlights:An additional two (2) drill holes for approximately 1,188.1 metres (m) were completed during the Summer 2024 Drill Campaign and reported herein.Drill hole CS24-022 encountered 14 spodumene-pegmatite intervals, with the widest continuous interval of 52.3 m.Drill hole CS24-023 encountered 15 spodumene-pegmatite intervals, with the widest continuous interval of 188.6 m.Vancouver…