Q2 Metals Extends Mineralized Zone Strike Length to 1.5 Kilometres and Concludes the 2025 Winter Program at the Cisco Lithium Project in Quebec, Canada
Highlights:The 2025 Winter Program concluded with 6,997 metres (m) drilled across 14 holes.Drill hole CS25-028 encountered eight (8) spodumene pegmatite